In-depth

Tower Upgrading Done Right

The main tower at Amsterdam Airport Schiphol was recently upgraded with electronic flight strips and an additional six positions in an enhanced environment.

The rapid pace of technological development in the ATC sector brings with it the requirement to regularly upgrade airport towers. However, due to the disruption to services that can ensue, these projects are only undertaken on an infrequent basis and require the highest level of planning, preparation and efficiency in execution.

It is also essential that systems and infrastructure are chosen and integrated to deliver the maximum usable lifecycle so that the next tower upgrade can be held off to the latest possible date. The recent refurbishment and upgrading of the main airport tower at Amsterdam Airport Schiphol offers a great example of how this process can be achieved and the manner in which technology delivers efficient services and the best ergonomic design.

By 2016, when Dutch ANSP LVNL embarked on the project, some of the tower systems had been in operation for 10 to 15 years and a complete refurbishment and upgrade was due. The increase in air traffic over the years to a level of 500,000 movements annually also dictated an expansion in working positions from nine to fifteen within the same space. The ensuing refurbishment and upgrading program took over three years to plan and then execute. The project has resulted in one of the most modern and efficient air traffic control towers in the world.

The major goals of the upgrade program were to improve operational safety even further above the high level already being achieved, to maximise flight handling capability and to enhance the working environment for the air traffic controllers. These goals were delivered through a combination of technological and infrastructure enhancements.

The system upgrade with the greatest impact was in the changeover from paper to Frequentis electronic flight strips, whilst the greatest infrastructure and ergonomic returns came through the deployment of a customised KVM (keyboard, video, mouse) switching system for the controller information displays.

To create space for the additional controllers and to radically improve the working environment all system processing equipment is located in a data centre. Interconnection between the hardware and each operator's console working position is achieved by means of KVM extenders that convey images and operator commands instantly inside the tower. Operators are unaware of the physical location or distance to the computers they are using.

Aside from releasing space on the observation deck, removing the computer equipment to a remote location reduces noise and heat generation and enhances the environment for the controllers. It also enables easier and constant access to hardware at all times and ensures it resides in an optimal environment for maximum reliability and lifetimes.

Each controller's workstation comprises of three screens that are switchable for radar, flight control and other data. The controller can select between two trackball pointing devices. These work simultaneously to accommodate left- and right-handed staff; a facility specifically designed into the system by IHSE and Intronics engineers. Whilst a single pointing device operates across all three screens, the controller must select which is the active system at any one time – this ensure that inadvertent system operation is prevented.

The installation program was scheduled to minimise inconvenience to controllers and eliminate any disruption to the airport or flight operations. Prior to installation, meticulous planning was undertaken and a detailed schedule of works prepared. LVNL created a full-sized mockup of the main tower observation deck at their base, in which the new working positions were laid out and checked and integration procedures planned and rehearsed.

At 11pm on each night of the actual installation period, controllers moved to the backup tower to handle the overnight flight operations whilst teams of installers worked through the night, refurbishing the deck with a new ceiling, furniture, power supply, network cabling and HVAC and upgrading a single controller workstation at a time. Crews were required to vacate the area by 5am so that it could be prepared ready for the return of controllers at 6am.

Integration of the new KVM systems at the workstations was extremely efficient and its operation flawless. Over the planned 113-night programme, one console working position was originally scheduled to be replaced per week, in the end it went so smoothly that the last one was assembled in less than two nights. There was not a single outage or air traffic restriction during the entire refurbishment, a tremendous achievement by the LVNL team charged with this task.

A high level of system redundancy is provided by the KVM switch at each workstation. All KVM switches are connected together to enable an alarm signal to be raised should a single matrix fail. v